HALL REFURBISHMENT

Future Plans

  • Kitchen - Replace dishwasher, ovens and hob.

  • Kitchen - Replace units.

  • Kitchen - Install wall sheets.

  • Upstairs - Treat walls with anti-fungal paint and waterproof upstairs walls.

  • Upstairs - Replace main decorative window.

  • Upstairs - Purchase permanent mini PC with business quality webcam.

  • Site wide - Install positive air system.

  • Site wide - Install disabled lift.

Phase Three - Completed March 2022

  • Upstairs - Install Karndean flooring - DONE

  • Upstairs - Install multimedia area with Bluetooth audio system - DONE

  • Upgrade downstairs speakers with subwoofer and Bluetooth - DONE

  • Upstairs - Plaster all walls - DONE

  • Upstairs - Paint walls - DONE

  • Upstairs - Replace ceiling - DONE

  • Upstairs - Repaint window sills - DONE

  • Upstairs - Replace spotlights with LEDs - DONE

  • Upstairs - Add shelving to cupboards - DONE

 

Phase Two Completed June 2021

Men's Toilets
 
  • Removal of one urinal 

  • Replace and resite urinal to corner to give more privacy.

  • Move sink and install inside the toilet.

  • Replace old tiles with waterproof sheeting.

  • Replace floor with non slip tiles.

  • Treat the walls with anti-fungal and waterproofing.

  • Woodwork to be treated and repainted.

  • Install radiator.

  • Add mirror.

  • Install door closer.

  • Hide any surface mounted cabling.

  • Replace door and closer.

Ladies Toilets​
 
  • Replace old tiles with waterproof sheeting.

  • Replace floor with non slip tiles.

  • Treat the walls with anti-fungal and waterproofing.

  • Woodwork to be treated and repainted.

  • Install radiator.

  • Add mirror.

  • Install door closer.

  • Hide any surface mounted cabling.

  • Remove hot water system and replace with hot tap.

  • Replace door and closer.

Disabled Toilets
 
  • Replace old tiles with waterproof sheeting.

  • Resite sink.

  • Add baby changing unit.

  • Replace grab assisted railing.

  • Treat the walls with anti-fungal and waterproofing.

  • Woodwork to be treated and repainted.

  • Install radiator.

  • Add mirror.

  • Hide any surface mounted cabling.

Area Outside of Men's Toilets
 
  • Install permanent cleaning cupboard.

  • Treat the walls with anti-fungal and waterproofing.

  • Repaint walls.

  • Replace floor with non slip tiles.

Bar
 
  • Remove old bar and shelving units.

  • Treat the walls with anti-fungal and waterproofing.

  • Plaster walls and ceiling.

  • Replace floor with non slip tiles.

  • Replace bar with a wooden version.

  • Adding shelving below the bar for glasses.

  • Install pelmet.

  • Install motorised security shutters.

  • Build floor to ceiling cupboard for storage and glass washer.

  • Add two lockable coolers and wine cooler.

  • Box in boiler.

  • Install false ceiling for spotlights.

  • Install coffee machine.

  • Install new door and closer.

Bar Cupboard

  • Treat the walls with anti-fungal and waterproofing.

  • Install waterproof sheeting.

  • Replace floor with tiles.

  • Remove and replace shelving.

  • Move data cabinet to above the door.

Main Hall

  • Install new smart heating thermostat.

  • Treat the walls with anti-fungal and waterproofing.

  • Plaster and paint walls.

  • Replace Ceiling.

  • Add a permanent cupboard under the stairs for the tables.

  • Add shelving in the stage area.

  • Woodwork to be treated and repainted.

  • Replace radiators.

  • Replace curtains.

  • Install blackout blinds.

  • Install a public Wi-Fi access point.

  • Purchase 100 comfy chairs.

  • Upgrade sound system from stereo to 5.1.

  • Removal of the internal porch.

  • Resite the internal door closer to the external door.

  • Remove old ceiling and replace.

  • Insulate ceiling space with acoustic dampening insulation.

  • Install new public Wi-Fi network.

Upstairs

  • Clear the back wall and cupboards.

  • Remove all gaming equipment and furniture.

  • Repaint the window sills.

  • Install a permanent shelving unit at the back wall with individual lockable cupboards.

  • Install a child-proof stairgate at the top of the stairs.

  • Paint and add non slip material to the steps.

  • Install laptop trolley with four laptops and a printer.

  • Create a meeting area with six chairs and table.

  • Install kitchenette with 3 meter worktop, sink, cupboard space and fridge.

Kitchen

  • Replace crockery, cutlery, utensils, pots and pans.

  • Kitchen - Treat the walls with anti-fungal and waterproofing.

  • Kitchen - Replace wall tiles with plastered walls.

  • Kitchen - Replace flooring with non-slip tiles toughened vinyl.

  • Install fire door with closer.

External

  • Repaint outside door.

  • Repaint rail.

  • Install emergency lighting behind the hall.

  • Install a permanent switchable light above the door.

Phase One Completed  2018

  • Sound system with microphones.

  • Install T-Loop System.

  • Install 4K Projector.

  • Re-wire of lighting, kitchen and bar area.

  • Additional wired in smoke alarm in each area.

  • Replace extension roof.